Book a walkthrough

Every township's rules, and the sentence each one came from.

Local rules decide whether a project gets built, and they are written one township at a time. The Ordinance Library gathers them across a whole state and verifies every entry against the document it came from.

What reaches a decision maker is short: the handful of rules that matter to this project, in this place. The source is one step behind each of them.

See one read

One ordinance, read.

A township's solar article, and what the library holds from it, beside what the state requires.

Choose an entry to see its sentence. Then verify it.

Calloway Township Zoning Ordinance

pp. 110 to 119

Calloway Township Zoning OrdinancePage 110

Article 14 Solar energy systems

§ 14.01 Purpose

This Article provides for the siting, construction, operation and removal of solar energy systems in a manner that protects the public health, safety and welfare, preserves the agricultural character of the Township, and is consistent with the Calloway Township Master Plan.

§ 14.02 Definitions

As used in this Article:

(A) Non-participating parcel means a parcel of record that is not subject to a lease, easement or other written agreement with the owner or operator of a solar energy system.

(B) Participating parcel means a parcel of record on which any part of a solar energy system is located, or whose owner has entered into a written agreement with the owner or operator of the system.

(C) Principal-use solar energy system means a solar energy system with a nameplate capacity of 2 megawatts or more, the principal purpose of which is to deliver electricity to the transmission or distribution grid.

(D) Solar array means the photovoltaic panels of a system together with their racking, posts and tracking equipment.

§ 14.03 Where permitted

A principal-use solar energy system is permitted only in the AG Agricultural District and the I-1 Light Industrial District, and only by special use permit issued under Article 19 and this Article. Where this Article and Article 19 differ, the stricter provision applies.

Calloway Township Zoning OrdinancePage 111

§ 14.04 Application

(A) In addition to the materials required by Article 19, an application shall include a site plan showing all arrays, fences, access drives, inverters, substations and existing dwellings. The site plan shall be drawn at a scale of not less than 1 inch to 200 feet.

(B) The applicant shall hold a public information meeting within the Township not less than 30 days before an application is filed. Notice of the meeting shall be mailed to the owner of every parcel adjoining a participating parcel.

(C) The Planning Commission shall hold a public hearing within 60 days after the Zoning Administrator determines that an application is complete.

§ 14.05 Area

(A) A principal-use solar energy system shall occupy a project area of not less than 40 acres.

(B) The combined project area of all principal-use solar energy systems in the Township shall not exceed 1,500 acres. The Zoning Administrator shall keep a current account of the acreage approved.

Calloway Township Zoning OrdinancePage 112

§ 14.06 Dimensional standards

(A) Measurement. A setback under this Section is measured horizontally from the nearest edge of the nearest solar array. Fences, landscaping and access drives may be located within a setback.

(B) Setbacks.

(1) Solar arrays shall be set back at least 100 feet from the right-of-way of any public road.

(2) Solar arrays shall be set back at least 500 feet from any dwelling on a non-participating parcel, measured from the nearest edge of the array.

(3) Solar arrays shall be set back at least 150 feet from the property line of any non-participating parcel. The owner of the adjoining parcel may waive this setback by a recorded instrument.

(4) Solar arrays shall be set back at least 75 feet from the top of the bank of any county drain, stream or regulated wetland.

Calloway Township Zoning OrdinancePage 113

(C) Height. No component of a solar array shall exceed 16 feet in height above grade when oriented at maximum tilt.

(D) Coverage. The ground area covered by solar arrays, measured at minimum tilt, shall not exceed 50 percent of the project area.

(E) Fencing. The system shall be enclosed by a perimeter fence at least 7 feet in height. The fence shall be of woven wire in an agricultural style. Barbed wire and razor wire are prohibited.

Calloway Township Zoning OrdinancePage 114

§ 14.07 Sound, glare and lighting

(A) Sound from the system shall not exceed 45 dBA Leq (1-hour) at the property line of any non-participating parcel.

(B) The operator shall submit a post-construction sound study, prepared by a qualified acoustician, within 6 months after commercial operation begins.

(C) Panels shall have an anti-reflective coating. The system shall not direct glare onto a dwelling on a non-participating parcel or onto a public road.

(D) Lighting shall be limited to what is needed for safety and security, shall be fully shielded and shall be directed downward. No light fixture shall be mounted more than 20 feet above grade.

Calloway Township Zoning OrdinancePage 115

§ 14.08 Screening and ground cover

(A) A vegetative screen at least 25 feet in width shall be planted and maintained along each side of the system that faces a public road or a dwelling on a non-participating parcel.

(B) Evergreen trees in the screen shall be at least 6 feet in height at the time of planting. Trees shall be spaced not more than 12 feet on center, in two staggered rows.

(C) Plantings that die shall be replaced in the next planting season.

(D) The ground beneath and between the arrays shall be kept in perennial vegetation. Bare soil, gravel and stone are permitted only on access drives and equipment pads.

Calloway Township Zoning OrdinancePage 116

§ 14.09 Roads, drainage and construction

(A) Before a building permit is issued, the applicant shall enter into a road use agreement with the Merrow County Road Commission covering haul routes, bonding and the repair of public roads.

(B) The applicant shall locate all drain tile within the project area before construction. Drain tile damaged by construction or operation shall be repaired or rerouted at the operator's expense so that drainage of adjoining land is not impaired.

(C) Collection lines within the project area shall be placed underground, except where they connect to a substation or to the grid.

Calloway Township Zoning OrdinancePage 117

§ 14.10 Energy storage and safety

(A) An emergency response plan shall be filed with the Township and the fire department before commercial operation, and reviewed with the fire department each year.

(B) An energy storage component of the system shall be located at least 300 feet from any dwelling on a non-participating parcel.

(C) The operator shall post, at each entrance, the name of the operator and a telephone number answered at all hours.

Calloway Township Zoning OrdinancePage 118

§ 14.11 Decommissioning

(A) A system that has not delivered electricity for 12 consecutive months is abandoned.

(B) Decommissioning shall be completed within 18 months after a system is abandoned or reaches the end of its useful life.

(C) All structures, foundations and cable shall be removed to a depth of at least 4 feet below grade, and the land restored to a condition suitable for agricultural use.

(D) The applicant shall post financial assurance equal to 125 percent of the estimated cost of decommissioning before a building permit is issued. The estimate shall be prepared by a licensed engineer and shall not be reduced by salvage value.

Calloway Township Zoning OrdinancePage 119

§ 14.12 Transfer and violations

(A) A special use permit issued under this Article runs with the land. The operator shall notify the Township in writing before ownership or operation of the system is transferred.

(B) A violation of this Article or of a condition of approval is a municipal civil infraction and is grounds for revocation of the permit under Article 19.

End of Article 14

Illustrative ordinance. Not a real township.

Provisions on file, solar

Provision Value Unit Section Page State Verify
Principal-use threshold 2 MW § 14.02(C) p. 110 Matches its sentence
Site plan scale 200 ft/in § 14.04(A) p. 111 Matches its sentence
Public meeting before filing 30 days § 14.04(B) p. 111 Matches its sentence
Hearing after a complete application 60 days § 14.04(C) p. 111 Matches its sentence
Minimum project area 40 acres § 14.05(A) p. 111 Matches its sentence
Township-wide cap 1,500 acres § 14.05(B) p. 111 Matches its sentence
Setback, road right-of-way 100 ft § 14.06(B)(1) p. 112 State 50 ft Matches its sentence
Setback, non-participating dwelling 500 ft § 14.06(B)(2) p. 112 State 300 ft Matches its sentence
Setback, non-participating property line 150 ft § 14.06(B)(3) p. 112 State 50 ft Matches its sentence
Setback, drain or wetland 75 ft § 14.06(B)(4) p. 112 Matches its sentence
Maximum height 16 ft § 14.06(C) p. 113 State 25 ft Matches its sentence
Maximum coverage 50 % § 14.06(D) p. 113 Matches its sentence
Perimeter fence height 7 ft § 14.06(E) p. 113 Matches its sentence
Sound limit 45 dBA § 14.07(A) p. 114 State 55 dBA Matches its sentence
Post-construction sound study 6 months § 14.07(B) p. 114 Matches its sentence
Light fixture height 20 ft § 14.07(D) p. 114 Matches its sentence
Vegetative screen width 25 ft § 14.08(A) p. 115 Matches its sentence
Tree height at planting 6 ft § 14.08(B) p. 115 Matches its sentence
Tree spacing 12 ft § 14.08(B) p. 115 Matches its sentence
Setback, energy storage to dwelling Its sentence says 300. Sent for review. 250 ft § 14.10(B) p. 117 Does not match its sentence
Abandonment 12 months § 14.11(A) p. 118 Matches its sentence
Decommissioning deadline 18 months § 14.11(B) p. 118 Matches its sentence
Removal depth 4 ft § 14.11(C) p. 118 Matches its sentence
Financial assurance 125 % § 14.11(D) p. 118 State 100% by yr 10 Matches its sentence

23 of 24 match their sentence. One sent for review.

State values are those Michigan Public Act 233 of 2023 sets for solar, shown for comparison.

§ 14.06
The same illustrative ordinance, read clause by clause. Each setback in § 14.06(B) moves a marker on the checklist to its distance: 100 ft from a road right-of-way, 500 ft from a non-participating dwelling, 150 ft from a non-participating property line and 75 ft from a drain or wetland.

Three verifications stand between an ordinance and a decision.

  • Quoted.

    Every entry carries the sentence it came from, matched against the source document. No sentence, no entry.

  • Rule-verified.

    Every number in an entry has to appear in its sentence.

  • Verified for meaning.

    Each entry is read against its sentence for what it means, not just the numbers in it.

An entry that fails verification is held for review. Nobody plans a project around it in the meantime.

In Michigan, the township decides.

So our team resolved every one of the state's 1,329 zoning jurisdictions, 741 of them with provisions on file. That is more than 18,000 provisions, each quoted to its sentence with section and page.

The source documents are stored, versioned and re-verified daily, and each local rule is shown beside the state siting requirement.

Read the proof

Found at the start, not at the hearing.

Ordinances that contradict themselves stall a project when they surface late. Found at the start, they go to legal as a ready tracker to review, not a question to research.

No sentence, no entry.

Book a walkthrough

Built with First Land Services, whose field teams do this work every day.