Every township's rules, and the sentence each one came from.
Local rules decide whether a project gets built, and they are written one township at a time. The Ordinance Library gathers them across a whole state and verifies every entry against the document it came from.
What reaches a decision maker is short: the handful of rules that matter to this project, in this place. The source is one step behind each of them.
One ordinance, read.
A township's solar article, and what the library holds from it, beside what the state requires.
Choose an entry to see its sentence. Then verify it.
Calloway Township Zoning Ordinance
pp. 110 to 119
Calloway Township Zoning OrdinancePage 110
Article 14 Solar energy systems
§ 14.01 Purpose
This Article provides for the siting, construction, operation and removal of solar energy systems in a manner that protects the public health, safety and welfare, preserves the agricultural character of the Township, and is consistent with the Calloway Township Master Plan.
§ 14.02 Definitions
As used in this Article:
(A) Non-participating parcel means a parcel of record that is not subject to a lease, easement or other written agreement with the owner or operator of a solar energy system.
(B) Participating parcel means a parcel of record on which any part of a solar energy system is located, or whose owner has entered into a written agreement with the owner or operator of the system.
(D) Solar array means the photovoltaic panels of a system together with their racking, posts and tracking equipment.
§ 14.03 Where permitted
A principal-use solar energy system is permitted only in the AG Agricultural District and the I-1 Light Industrial District, and only by special use permit issued under Article 19 and this Article. Where this Article and Article 19 differ, the stricter provision applies.
Calloway Township Zoning OrdinancePage 111
§ 14.04 Application
(A) In addition to the materials required by Article 19, an application shall include a site plan showing all arrays, fences, access drives, inverters, substations and existing dwellings. The site plan shall be drawn at a scale of not less than 1 inch to 200 feet.
(B) The applicant shall hold a public information meeting within the Township not less than 30 days before an application is filed. Notice of the meeting shall be mailed to the owner of every parcel adjoining a participating parcel.
§ 14.05 Area
(A) A principal-use solar energy system shall occupy a project area of not less than 40 acres.
(B) The combined project area of all principal-use solar energy systems in the Township shall not exceed 1,500 acres. The Zoning Administrator shall keep a current account of the acreage approved.
Calloway Township Zoning OrdinancePage 112
§ 14.06 Dimensional standards
(A) Measurement. A setback under this Section is measured horizontally from the nearest edge of the nearest solar array. Fences, landscaping and access drives may be located within a setback.
(B) Setbacks.
(1) Solar arrays shall be set back at least 100 feet from the right-of-way of any public road.
(3) Solar arrays shall be set back at least 150 feet from the property line of any non-participating parcel. The owner of the adjoining parcel may waive this setback by a recorded instrument.
Calloway Township Zoning OrdinancePage 113
(C) Height. No component of a solar array shall exceed 16 feet in height above grade when oriented at maximum tilt.
(D) Coverage. The ground area covered by solar arrays, measured at minimum tilt, shall not exceed 50 percent of the project area.
(E) Fencing. The system shall be enclosed by a perimeter fence at least 7 feet in height. The fence shall be of woven wire in an agricultural style. Barbed wire and razor wire are prohibited.
Calloway Township Zoning OrdinancePage 114
§ 14.07 Sound, glare and lighting
(C) Panels shall have an anti-reflective coating. The system shall not direct glare onto a dwelling on a non-participating parcel or onto a public road.
(D) Lighting shall be limited to what is needed for safety and security, shall be fully shielded and shall be directed downward. No light fixture shall be mounted more than 20 feet above grade.
Calloway Township Zoning OrdinancePage 115
§ 14.08 Screening and ground cover
(B) Evergreen trees in the screen shall be at least 6 feet in height at the time of planting. Trees shall be spaced not more than 12 feet on center, in two staggered rows.
(C) Plantings that die shall be replaced in the next planting season.
(D) The ground beneath and between the arrays shall be kept in perennial vegetation. Bare soil, gravel and stone are permitted only on access drives and equipment pads.
Calloway Township Zoning OrdinancePage 116
§ 14.09 Roads, drainage and construction
(A) Before a building permit is issued, the applicant shall enter into a road use agreement with the Merrow County Road Commission covering haul routes, bonding and the repair of public roads.
(B) The applicant shall locate all drain tile within the project area before construction. Drain tile damaged by construction or operation shall be repaired or rerouted at the operator's expense so that drainage of adjoining land is not impaired.
(C) Collection lines within the project area shall be placed underground, except where they connect to a substation or to the grid.
Calloway Township Zoning OrdinancePage 117
§ 14.10 Energy storage and safety
(A) An emergency response plan shall be filed with the Township and the fire department before commercial operation, and reviewed with the fire department each year.
(C) The operator shall post, at each entrance, the name of the operator and a telephone number answered at all hours.
Calloway Township Zoning OrdinancePage 118
§ 14.11 Decommissioning
(A) A system that has not delivered electricity for 12 consecutive months is abandoned.
(C) All structures, foundations and cable shall be removed to a depth of at least 4 feet below grade, and the land restored to a condition suitable for agricultural use.
(D) The applicant shall post financial assurance equal to 125 percent of the estimated cost of decommissioning before a building permit is issued. The estimate shall be prepared by a licensed engineer and shall not be reduced by salvage value.
Calloway Township Zoning OrdinancePage 119
§ 14.12 Transfer and violations
(A) A special use permit issued under this Article runs with the land. The operator shall notify the Township in writing before ownership or operation of the system is transferred.
(B) A violation of this Article or of a condition of approval is a municipal civil infraction and is grounds for revocation of the permit under Article 19.
End of Article 14
Illustrative ordinance. Not a real township.
Provisions on file, solar
| Provision | Value | Unit | Section | Page | State | Verify |
|---|---|---|---|---|---|---|
| Principal-use threshold | 2 | MW | § 14.02(C) | p. 110 | Matches its sentence | |
| Site plan scale | 200 | ft/in | § 14.04(A) | p. 111 | Matches its sentence | |
| Public meeting before filing | 30 | days | § 14.04(B) | p. 111 | Matches its sentence | |
| Hearing after a complete application | 60 | days | § 14.04(C) | p. 111 | Matches its sentence | |
| Minimum project area | 40 | acres | § 14.05(A) | p. 111 | Matches its sentence | |
| Township-wide cap | 1,500 | acres | § 14.05(B) | p. 111 | Matches its sentence | |
| Setback, road right-of-way | 100 | ft | § 14.06(B)(1) | p. 112 | State 50 ft | Matches its sentence |
| Setback, non-participating dwelling | 500 | ft | § 14.06(B)(2) | p. 112 | State 300 ft | Matches its sentence |
| Setback, non-participating property line | 150 | ft | § 14.06(B)(3) | p. 112 | State 50 ft | Matches its sentence |
| Setback, drain or wetland | 75 | ft | § 14.06(B)(4) | p. 112 | Matches its sentence | |
| Maximum height | 16 | ft | § 14.06(C) | p. 113 | State 25 ft | Matches its sentence |
| Maximum coverage | 50 | % | § 14.06(D) | p. 113 | Matches its sentence | |
| Perimeter fence height | 7 | ft | § 14.06(E) | p. 113 | Matches its sentence | |
| Sound limit | 45 | dBA | § 14.07(A) | p. 114 | State 55 dBA | Matches its sentence |
| Post-construction sound study | 6 | months | § 14.07(B) | p. 114 | Matches its sentence | |
| Light fixture height | 20 | ft | § 14.07(D) | p. 114 | Matches its sentence | |
| Vegetative screen width | 25 | ft | § 14.08(A) | p. 115 | Matches its sentence | |
| Tree height at planting | 6 | ft | § 14.08(B) | p. 115 | Matches its sentence | |
| Tree spacing | 12 | ft | § 14.08(B) | p. 115 | Matches its sentence | |
| Setback, energy storage to dwelling Its sentence says 300. Sent for review. | 250 | ft | § 14.10(B) | p. 117 | Does not match its sentence | |
| Abandonment | 12 | months | § 14.11(A) | p. 118 | Matches its sentence | |
| Decommissioning deadline | 18 | months | § 14.11(B) | p. 118 | Matches its sentence | |
| Removal depth | 4 | ft | § 14.11(C) | p. 118 | Matches its sentence | |
| Financial assurance | 125 | % | § 14.11(D) | p. 118 | State 100% by yr 10 | Matches its sentence |
Three verifications stand between an ordinance and a decision.
-
Quoted.
Every entry carries the sentence it came from, matched against the source document. No sentence, no entry.
-
Rule-verified.
Every number in an entry has to appear in its sentence.
-
Verified for meaning.
Each entry is read against its sentence for what it means, not just the numbers in it.
An entry that fails verification is held for review. Nobody plans a project around it in the meantime.
In Michigan, the township decides.
So our team resolved every one of the state's 1,329 zoning jurisdictions, 741 of them with provisions on file. That is more than 18,000 provisions, each quoted to its sentence with section and page.
The source documents are stored, versioned and re-verified daily, and each local rule is shown beside the state siting requirement.
Found at the start, not at the hearing.
Ordinances that contradict themselves stall a project when they surface late. Found at the start, they go to legal as a ready tracker to review, not a question to research.
No sentence, no entry.
Built with First Land Services, whose field teams do this work every day.